SAFETY
Safety Instructions
Installation
Electrical connection
Transportation
Packaging Handling
Storage
System Installation
EP900 Packaging List
B500 Packaging List
Installation Base List
Installation Requirements
Required Tools
Stacking the EP900 ESS
Electrical Connections
Connection
B500 external ports description
EP900 external interface description
Grounding Protection (PE)
Connect PV cable
Connect the grid and load cables
Connecting the positive and negative poles of the battery
IoT Controller
Other Interfaces
Power ON/OFF B500
Firmware Upgrade
System Check
Preliminary Check
Power On
Power OFF
Contents
1.
1.1
1.2
1.3
1.4
1.5
1.6
2.
2.1
2.2
2.3
2.4
2.5
2.6
3.
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
4.
4.1
4.2
4.3
06
06
11
13
16
16
16
17
17
20
22
22
26
28
29
30
34
36
37
38
41
43
45
50
56
56
58
58
58
58