EasyManua.ls Logo

Borri GALILEO UPS - Installation and Operation; Unpacking and Package Contents; Installation Environment and Positioning

Borri GALILEO UPS
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 5
Battery box
3 Installation and operation
Installation position
Itisnecessarytoselectaproperenvironmenttoinstallthe
unit,inordertominimizethepossibilityofdamagetothe
battery box and extend the life of the batteries.
Pleasefollowtheinstructionsbelow:
Keepatleast30cm(12inches)clearancefromtherearpanel
of the battery box from the wall or other obstructions.
Donotblocktheair-flowtotheventilationopeningsof
the unit.
Pleaseensuretheinstallaonsiteenvironmentalcondions
areinaccordancewiththebaeryboxworkingspecicaons
 toavoidoverheatandexcessivemoisture.
Donotplacethebaeryboxinadustyorcorrosive
environmentornearanyammableobjects.
Thisbaeryboxisnotdesignedforoutdooruse.
The packing condition and the external outlook of the unit must be
inspected carefully before installation.
Retain the packing material for future use.
Unpacking
TakethebatteryboxoutofthePEfoam.
Removethepackingmaterials.
Note: The battery box module is approx. 12.2 ~ 50 kgs, be cautious when unpacking
and lifting the unit to avoid injury.
Standard package includes:
DCconnectcable(C1orC2)
AccessoriesforTowerMount
AccessoriesforRack/TowerA1~A2,B1~B2,S1~S3
1pcsC1 C2 2pcs