Page 5
Battery box
3 Installation and operation
Installation position
Itisnecessarytoselectaproperenvironmenttoinstallthe
unit,inordertominimizethepossibilityofdamagetothe
battery box and extend the life of the batteries.
Pleasefollowtheinstructionsbelow:
Keepatleast30cm(12inches)clearancefromtherearpanel
of the battery box from the wall or other obstructions.
Donotblocktheair-flowtotheventilationopeningsof
the unit.
Pleaseensuretheinstallaonsiteenvironmentalcondions
areinaccordancewiththebaeryboxworkingspecicaons
toavoidoverheatandexcessivemoisture.
Donotplacethebaeryboxinadustyorcorrosive
environmentornearanyammableobjects.
Thisbaeryboxisnotdesignedforoutdooruse.
The packing condition and the external outlook of the unit must be
inspected carefully before installation.
Retain the packing material for future use.
Unpacking
TakethebatteryboxoutofthePEfoam.
Removethepackingmaterials.
Note: The battery box module is approx. 12.2 ~ 50 kgs, be cautious when unpacking
and lifting the unit to avoid injury.
Standard package includes:
DCconnectcable(C1orC2)
AccessoriesforTowerMount
AccessoriesforRack/TowerA1~A2,B1~B2,S1~S3
1pcsC1 C2 2pcs