EasyManua.ls Logo

BOS LE300 - Commissioning Procedure; Initial Startup and Status Check; System Charge for Accuracy

Default Icon
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
Once mechanical and electrical connection is done according to chapter 5, the
LE300 will automatically start working and supporting the lead acid battery sys-
tem. Please push the pushbutton of LEs to check the status of the products (see
details in chapter 7).
It is recommended to fully charge the system once LEs were connected. A full
system charge is needed in order to give accurate information on the state of
charge of the system.
For devices which are stored over a longer period of time, several charging cycles
might be necessary. This is done to balance each lithium-cells and to show an
accurate state-of-charge-trend-display.
6. COMMISSIONING
Tighten the installed cables with a cable tie to the strain relief connectors to
avoid damages to the electronics from moving cables.

Other manuals for BOS LE300