EasyManua.ls Logo

Bosch D7412GV4 - Keypad Cleaning

Bosch D7412GV4
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12 en | Diagrams
2016.07 | 04 | F.01U.291.483 UL Installation Guide Bosch Security Systens, Inc.
3.2 Power Supply Side Wiring Diagrams
3.2.1 D9412GV4/D7412GV4 v2.00 (and higher) Power Supply Side System
(D113, D122/D122L, D192G, D928, D1640, D8132) Wiring Diagram (Power
and Phone)
Figure3.5: Side System Wiring Diagram
Callout - Description Callout - Description
1 - If required by local AHJ, connect D113
Battery Lead Supervision Module.
8 - To Output A or Output B
2 - Batteries 9 - Listed Audible Signaling Devices rated at 12.0 VDC nominal
(do not use vibrating type horns)
3 - D122/D122L Dual Battery Harness, as
required
10 - C900V2 (optional)
4 - To Supervision Point 11 - Secondary phone line (part of D928)
5 - D1640 Transformer (NFPA applications may
require the use of a D8004 Transformer
Enclosure
12 - 560 Ω, 2 W end-of-line (EOL) Resistor (P/N: 15-03130-005)
6 - D8132 Dual Battery Charger with two
batteries (Batteries are not supervised.)
13 - D928
7 - D192G Bell Supervision Module 14 - To earth ground

Other manuals for Bosch D7412GV4

Related product manuals