EasyManua.ls Logo

Bosch EHP 6-11 LW - Page 60

Bosch EHP 6-11 LW
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
60
FOR THE INSTALLER
7. When the system is full and air no longer comes from the return pipe
run the system for at least a further 30 minutes. You can also start
the heat transfer fl uid pump to speed up the air venting. Enter manual
operation under menu 5.3 and start the pump G3 (P3). See Commis-
sioning the heat pump/Testing the heat pump manually.
8. When venting is complete open valve 3, shut valve 2, and shortly after
shut also valve 1. Disconnect the hoses and the heat transfer fl uid side
is ready for operation.
Note
It is an advantage if an overpressure
is created in the heat transfer fl uid
circuit. An underpressure damages the
expansion tank and the collector hose.
Expansion tank
Safety valve
Manual venting valve
Particle
lter
12
3
Connecting the heat pump to the heating system

Table of Contents

Related product manuals