English | 17
Bosch Power Tools 2 609 006 717 | (26.11.13)
Technical Data
Noise Information
Typically the A-weighted sound pressure level of the product
is less than 70 dB(A).
Declaration of Conformity
We declare under our sole responsibility that the product de-
scribed under “Technical Data” is in conformity with the fol-
lowing standards or standardization documents: EN 60335,
EN 300 220-1:2006, EN 300 220-2:2007, EN 301 489-
1:2008, EN 301 489-3:2002 according to the provisions of
the directives 2011/65/EU, 2006/95/EC, 2004/108/EC,
1999/5/EC.
11
Robert Bosch GmbH, Power Tools Division
D-70745 Leinfelden-Echterdingen
Leinfelden, 26.11.2013
Assembly
Before any work on the machine itself, pull the mains
plug.
Unreel the Feed Hose (see figure A)
–Open holding clamp 21 and completely unreel feed hose 2
from base unit 5.
–Lock holding clamp 21 again.
Note: When painting only with the paint applicator 3 (without
extension 1), the feed hose 2 can be fastened in one of the
two exterior guide grooves 12 for more convenient working.
Mounting the Extension (see figures B1–B2)
– Screw the screw connection 10 of the extension into the
paint applicator 3.
–Fasten feed hose 2 in the straight guide grooves 12 of
paint applicator 3 and extension 1.
– Remove remote control 8 from paint applicator 3 and clip
it into holder 6 of extension 1.
Operation
Before any work on the machine itself, pull the mains
plug.
Preparing for Operation
Working close to the edge of open waters or on neigh-
bouring areas in the direct vicinity of open waters is not
permitted.
When purchasing paint, observe its environmental compati-
bility.
Preparing the Surface to be Painted
The surface to be painted must be clean, dry and free of
grease.
When working indoors, all non-covered surface can be soiled.
Therefore, thoroughly prepare the area around the surface to
be painted:
– Cover or mask off floors, furnishings, door and window
frames, etc.
– Also, sufficiently underlay the paint bucket and base unit
with covering-off material (foil, cardboard, etc.).
Preparing the Paint
– Prepare the paint according to the manufacturer’s instruc-
tions.
– Stir paint thoroughly and dilute as required.
When the painting result is not satisfactory or no paint comes
out: See “Correction of Malfunctions”, page 19.
Coupling the Base Unit and the Paint Bucket
(see figures C1 –C2)
– Set down base unit 5 level on the floor next to the opened
paint bucket.
– Pull the height-adjustable paint-bucket coupling 29 up-
ward to the stop.
– Hold the paint bucket handle upright and slide the hooks of
the paint-bucket coupling down to the edge of the paint
bucket.
Electric Paint Roller PPR 250
Article number
3 603 BA0 0..
Rated power input
W35
Paint delivery capacity
ml/min 400
Required time for application of
paint on 2 m
2
min 1
Length
– Paint applicator
– Paint applicator + extension
– Feed hose
cm
cm
m
40
120
5
Dimensions of paint roll
–Width
– Shank diameter
– Total roll diameter (without pile)
– Pile height
–Pile material
cm
mm
mm
mm
25
8
45 –50
11
Polyester
Weight according to
EPTA-Procedure 01/2003
kg 3.7
Protection class
–Base unit
–Trigger switch with
remote control
IP X4 *
IP X5 **
* Protection against water splash from all directions
** Protection against water jets from all directions
The values given are valid for a nominal voltage [U] of 230 V. For different
voltages and models for specific countries, these values can vary.
Henk Becker
Executive Vice President
Engineering
Helmut Heinzelmann
Head of Product Certification
PT/ETM9
OBJ_BUCH-1513-004.book Page 17 Tuesday, November 26, 2013 4:07 PM
Ташев-Галвинг ООД
www.tashev-galving.com