EasyManua.ls Logo

Bosch SHE44C07UC/22 - Page 3

Bosch SHE44C07UC/22
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Tooms and Matedams Needed
TOOLS NEEDED
Hammer
\
Hob Saw
Tape Measure
Sbt Screwd river
PhHHpsScrewdriver
%20 Screwdriver
Wire Cutter Wire Stripper DrHU
LeveU
MATERIALS NEEDED
(AdditionaU materiab may be required to compUywith UocaUcodes,)
EbctrbaU SuppUyCabb ° Minimum #14 AWG, 2 conductor, 1 ground, insuUatedcopper
conductors rated 75°C or higher,
Hot Water Supply Line - Minimum 3/8" O,D, copper tubing or metal braided dishwasher
supply line,
Shut-off valve and fittings appropriate for hot water supply line (copper tubing/
compression fitting, or braided hose),
90° elbow with 3/8" N,RT, male threads on one leg, and sized to fit your water supply
line (copper tubing/compression fitting, or braided hose) on the other leg,
Teflon tape or other pipe thread compound to seal plumbing connections,
UL listed conduit connector or strain relief,
2

Related product manuals