EasyManua.ls Logo

Bosch VLE 2130 EL - User Manual

Bosch VLE 2130 EL
84 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
de
Erstinbetriebnahme
2-Säulen-Hebebühne
en
Initial operation
2-post lifts
fr
Démarrage seulement
Plates-formes élévatrices à 2 colonnes
es
Funcionamiento Inicial
Plataforma elevadora de 2 columnas
it
Funzionamento iniziale
Ponte sollevatore a 2 colonne
sv
Driftstart
2-pelarlyftar
nl
Eerste ingebruikname“
2-koloms hefplatforms
VLE 2130 EL

Table of Contents

Other manuals for Bosch VLE 2130 EL

Question and Answer IconNeed help?

Do you have a question about the Bosch VLE 2130 EL and is the answer not in the manual?

Summary

Symbols Used

Documentation Symbols and Warnings

Explains warning notice structure, meaning, and symbols used in the manual.

Warning Notice Structure

Details the structure of warning notices, including keywords for hazard and prevention.

Manual Symbol Definitions

Defines symbols like Attention, Information, and steps for instructions.

Product Warning Labels and Disposal

Emphasizes observing product warnings and proper disposal of electrical/electronic devices.

General Information

Lifting Platform Delivery Requirements

States requirements for delivery, including forklift needs and platform weight.

Third-Party Installation and Safety Acceptance

Outlines conditions and safety acceptance for installation by non-Bosch personnel.

Annual Safety Inspection (UVV)

Mandates annual safety acceptance by a qualified person for continued safe operation.

Warranty Conditions and Parts

Explains warranty requirements, including safety acceptance and genuine Bosch parts.

Installation Preparation and Foundations

User Preparation for Column Installation

Details user responsibilities before erection, including foundation construction and cable routing.

Foundation Requirements

Specifies requirements for a flat, frost-proof, horizontal concrete floor for proper installation.

Individual Footing Design

Provides detailed specifications for individual concrete footings.

Formwork Specifications

Details specifications for formwork, including reinforcement and connectors.

Continuous Footing Design

Lists specifications for continuous concrete footings.

Shear Connector Installation

Guides on using shear connectors, including manufacturer instructions.

Installation Procedures

Mechanical Installation Steps

Covers mechanical erection, safety clearances, and column positioning.

Column Erection Process

Details connecting base panels and erecting columns.

Support Arm Installation

Describes fitting support arms and securing locking rods.

Securing Support Arms

Explains securing outer bearings to prevent unintentional disengagement.

Tensioning Strap Installation

Guides on fitting the tensioning strap.

Electrical Connection Procedures

Details electrical connections for power, secondary column, and rotary fields.

Power Cord Connection

Specifies wiring for connecting the power cord.

Secondary Column Wiring

Outlines connections for secondary column motor and thermoswitch.

Rotary Field Verification

Provides steps to check and correct motor rotary fields.

Setting Cut-out Points and Safety Stop

Explains checking and adjusting cut-out points for safe operation.

General Cut-out Point Setting Info

Covers checking settings, measuring voltages, and general recommendations.

Setting Lower Cut-out Points

Details setting lower cut-out points and equalizing arm heights.

Setting Upper Cut-out Points

Describes setting upper cut-out points, considering ceiling height.

Setting the Safety Stop Position

Guides on setting the safety stop position.

Resetting to Factory Settings

Explains the procedure to reset the platform to factory settings.

Final Inspection and User Instruction

Bosch VLE 2130 EL Specifications

General IconGeneral
BrandBosch
ModelVLE 2130 EL
CategoryLifting Systems
LanguageEnglish

Related product manuals