EasyManua.ls Logo

Bosch ZSB 30-2 - User Manual

Bosch ZSB 30-2
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Installation and servicing instructions for contractors
Hydronic Gas Condensing Boiler
Condens 5000 W
6 720 613 085-00.1O
ZSB 30-2 A ...| ZWB 37-2 A ...
6 720 644 143 (2010/09) NZ/AU

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Bosch ZSB 30-2 and is the answer not in the manual?

Summary

Key to Symbols and Safety Instructions

Essential Safety Instructions

Lists crucial safety procedures for gas, flue gas, electrical, and hot water hazards.

Electrical Wiring Diagrams

ZSB 30-2 Wiring Schematic

Presents the electrical wiring schematic for the ZSB 30-2 model.

ZWB 37-2 Wiring Schematic

Shows the electrical wiring schematic specifically for the ZWB 37-2 model.

Technical Specifications

ZSB 30-2 Performance Data

Details the performance and technical data for the ZSB 30-2 appliance.

ZWB 37-2 Performance Data

Details the performance and technical data for the ZWB 37-2 appliance.

Installation Procedures

General Installation Notes and Water Requirements

Covers general advisories, solar water, heating water, anti-freeze, and inhibitors.

Checking Water and Gas Connections

Procedures for verifying the integrity of water and gas supply connections.

Electrical Connections

General Electrical Info and Accessory Connection

Covers electrical supply, earthing, safety, and connecting accessories like the Heatronic unit.

Commissioning Overview

Commissioning Steps

Pre-Commissioning Checks and Startup

Steps to perform before commissioning and how to switch the appliance on.

DHW Temperature and Mode Settings

Instructions for setting DHW temperature and selecting Comfort/Economy modes.

Commissioning Steps

Starting Heating and Control Unit Setup

How to start central heating and configure the heating control unit.

Heatronic Settings

Overview of Service Functions

Lists all available service functions categorized into Level 1 and Level 2.

Heatronic Settings: Service Functions

Output Settings and Pump Maps

Details on setting max heating/DHW output and configuring pump maps for heating.

Pump Modes and Flow Temperature Settings

Explains pump switch modes, pump characteristic maps, and setting maximum flow temperature.

Air Purge, Operating Modes, and Timing Functions

Covers air purge, operating modes, anti-cycle times, and DHW pre-heat/burner settings.

Gas Type Conversion

Conversion Process and Gas-Air Ratio Adjustment

Details available conversion sets and the procedure for setting the gas-air ratio using CO2/O2 measurements.

Checking Gas Supply Pressure

Procedure for checking the gas supply pressure against specified ranges.

Flue Gas Testing

Testing Procedures and CO Measurement

Steps for performing flue gas testing, including CO2, O2, and CO measurements.

Inspection and Servicing

Servicing Notes and Required Equipment

Key notes, required test equipment, lubricants, and spare parts for servicing.

Servicing Operations

Fault Mode and Troubleshooting

Fault Mode: Display Codes

Fault Mode: Non-Display Faults

Commissioning Report Form

Summary

Key to Symbols and Safety Instructions

Essential Safety Instructions

Lists crucial safety procedures for gas, flue gas, electrical, and hot water hazards.

Electrical Wiring Diagrams

ZSB 30-2 Wiring Schematic

Presents the electrical wiring schematic for the ZSB 30-2 model.

ZWB 37-2 Wiring Schematic

Shows the electrical wiring schematic specifically for the ZWB 37-2 model.

Technical Specifications

ZSB 30-2 Performance Data

Details the performance and technical data for the ZSB 30-2 appliance.

ZWB 37-2 Performance Data

Details the performance and technical data for the ZWB 37-2 appliance.

Installation Procedures

General Installation Notes and Water Requirements

Covers general advisories, solar water, heating water, anti-freeze, and inhibitors.

Checking Water and Gas Connections

Procedures for verifying the integrity of water and gas supply connections.

Electrical Connections

General Electrical Info and Accessory Connection

Covers electrical supply, earthing, safety, and connecting accessories like the Heatronic unit.

Commissioning Overview

Commissioning Steps

Pre-Commissioning Checks and Startup

Steps to perform before commissioning and how to switch the appliance on.

DHW Temperature and Mode Settings

Instructions for setting DHW temperature and selecting Comfort/Economy modes.

Commissioning Steps

Starting Heating and Control Unit Setup

How to start central heating and configure the heating control unit.

Heatronic Settings

Overview of Service Functions

Lists all available service functions categorized into Level 1 and Level 2.

Heatronic Settings: Service Functions

Output Settings and Pump Maps

Details on setting max heating/DHW output and configuring pump maps for heating.

Pump Modes and Flow Temperature Settings

Explains pump switch modes, pump characteristic maps, and setting maximum flow temperature.

Air Purge, Operating Modes, and Timing Functions

Covers air purge, operating modes, anti-cycle times, and DHW pre-heat/burner settings.

Gas Type Conversion

Conversion Process and Gas-Air Ratio Adjustment

Details available conversion sets and the procedure for setting the gas-air ratio using CO2/O2 measurements.

Checking Gas Supply Pressure

Procedure for checking the gas supply pressure against specified ranges.

Flue Gas Testing

Testing Procedures and CO Measurement

Steps for performing flue gas testing, including CO2, O2, and CO measurements.

Inspection and Servicing

Servicing Notes and Required Equipment

Key notes, required test equipment, lubricants, and spare parts for servicing.

Servicing Operations

Fault Mode and Troubleshooting

Fault Mode: Display Codes

Fault Mode: Non-Display Faults

Commissioning Report Form

Bosch ZSB 30-2 Specifications

General IconGeneral
BrandBosch
ModelZSB 30-2
CategoryBoiler
LanguageEnglish

Related product manuals