EasyManua.ls Logo

BRAVILOR BONAMAT Solo User Manual

BRAVILOR BONAMAT Solo
22 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Solo
2
Operator manual
Mode d’emploi Opérateur
Operator Handbuch
Operator handleiding
Driftmanual
Operatørhåndbok
Betjeningsvejledning
Operaattorin käsikirja
Manual del operador
Manual do operador
Manuale per l’operatore
 
Provozní příručka
Instrukcja obsługi
Manualul operatorului
Ðóêîâîäñòâî îïåðàòîðà
Operatör klavuzu

Other manuals for BRAVILOR BONAMAT Solo

Question and Answer IconNeed help?

Do you have a question about the BRAVILOR BONAMAT Solo and is the answer not in the manual?

BRAVILOR BONAMAT Solo Specifications

General IconGeneral
BrandBRAVILOR BONAMAT
ModelSolo
CategoryCoffee Maker
LanguageEnglish

Summary

Installation Procedures

Initial Setup and Connections

Covers steps 1-6, focusing on unpacking, placement, power connection, and initial assembly.

Water Supply and Drip Tray Integration

Details steps 7-12, covering the connection of the water supply and the drip tray.

Final Adjustments and Checks

Includes steps 13-18 for making adjustments, performing safety checks, and securing components.

Installation Completion

Covers steps 19-22, detailing final checks and procedures to ensure operational readiness.

Descaling Process

Descaling Preparation and Initial Steps

Introduction to descaling and initial steps 1-6, including preparation and draining.

Descaling Procedure Part 1

Covers steps 7-12, detailing connection of hoses and preparation for descaling solution.

Descaling Procedure Part 2

Details steps 13-18, focusing on applying the descaling agent and initial contact times.

Descaling Procedure Part 3

Covers steps 19-24, detailing the main descaling cycle and agent contact duration.

Descaling Procedure Part 4

Includes steps 25-30, focusing on draining, rinsing, and preparing for the next phase.

Descaling Procedure Part 5

Covers steps 31-36, detailing further rinsing and initial system checks post-descaling.

Final Rinsing and Checks

Covers steps 37-42 for final rinsing, flushing, component reassembly, and checks.

Completing Descaling

Final steps 43-44 for completing the descaling process and final operational checks.

Related product manuals