Brent 1082/882 — Set Up
2-2
Set Up Checklist
After the cart has been completely assembled, use the following checklist and inspect the
cart. Check off each item as it is found satisfactory or after proper adjustment is made.
Torque wheel nuts and check tire pressure as specifi ed in MAINTENANCE section.
Axles are adjusted from shipping position to desired operating position. (If Applicable)
Tires are infl ated to specifi ed air pressure. (If Applicable)
All grease fi ttings have been lubricated and gearbox oil level checked.
Check to be sure all safety decals are correctly located and legible. Replace if damaged.
Check to be sure all refl ective decals are correctly located.
Check to be sure SMV decal is in place and shipping cover removed.
Check to be sure transport lights are working properly.
Check PTO. See “Verify Telescoping PTO Shaft Length” in MAINTENANCE section.
Check to be sure screens over auger are in place and properly secured.
Transport chains are properly installed and hardware is torqued to specifi cation. See “Transport
Chain Connection” in OPERATION section.
Paint all parts scratched in shipment.
Test run the augers. See “Auger Operation” in OPERATION section.
(April 2015)