EasyManua.ls Logo

Broyhill A102010903 - Step 16: Install Big Roof Middle Covers 2 & 3

Broyhill A102010903
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Put the Big roof middle cover 2 (AN) and Big
roof middle cover 3 (AP) beside the Big roof
middle cover 1(AM) at the long side, then put
the Big roof middle cover 2 (AN) and Big roof
middle cover 3 (AP) at the short side, locked
them by Bolt(H1) and Wrench(HW1)
23/29

Related product manuals