3.2.5.2 Technical specification
Free chlorine, low pH dependency
Membrane. Potentiostatic 3-electrode header
Embedded in the probe. 4-20mA output
Operation maximum pressure
0.5 bar. Water hammer effect must be avoided.
Directly on BSV control panel
Maximum time without CL on water
Water test: Minimum once a week
Header-membrane change: Once a year
Electrolyte change: Every 3-6 months, depending on the
quality of the water
3.2.5.3 Installation
Please, carefully follow the recommendations regarding probe installation in
order to ensure its proper operation:
3.2.5.3.1 Hydraulic installation
Attach the probe holder to the wall by means the screws and wall plugs
included in the box.
Ensure that the probe is correctly leveled.
As shown in the following Picture, the water inlet is in the lower left part of the
probe holder, while the water outlet is in the upper right side of the probe
holder.
In case a pH probe must be installed, it can be placed in the central part of the
probe holder, removing the yellow cap and install the pH probe.