3-INSTALLATION OF THE EQUIPMENT
3.1- General considerations::
Place the chlorination cell in the highest position possible of the purification
circuit and always after the filter.
If possible, it is recommended to install the cell with a by-pass system with
its corresponding shut-off valves. This is to facilitate maintenance of the cell.
A good earth connection is essential. Use a differential relay with max.
30mA of sensitivity.
If a good quality earth connection is not available, place an
earth connection kit between the electrolysis cell and the redox
probe. OPTIONAL KIT