EasyManua.ls Logo

BUD LIGHT MIS176BULT - Installing Your Beverage Center

BUD LIGHT MIS176BULT
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLING YOUR BEVERAGE CENTER
Remove all packaging material. This includes the foam base and all adhesive tape holding the
beverage center accessories inside and outside.
Inspect and remove any remaining packing, tape or printed materials before powering on the
Beverage Center.
Unpacking Your Beverage Center
Leveling Your Beverage Center
1.
2.
Your Bev erage Center has two leveling legs which are located in the front corners. After
properly placing your Beverage Center in its final position, you can level your Beverage
Center.
Leveling l egs can be adjusted by turning them clockwise to lower your Beverage Center or
by turning them counterclockwise to raise your Beverage Center. The Beverage Center door
will close more easily when the two front leveling legs are extended slightly.
Ensure th e drip t ray in the rear of the unit is in the proper position.
Proper Air Circulation
Drip Tray
Note: If your Beverage Center has been tilted for any reason, wait 24 hours before plugging it in.
To ensure that your Beverage Center works at the maximum e�ciency it
was designed for, you should install it in a location where there is proper air
circulation and electrical connections.
The follow ing are recommended clearances around the beverage center:
Sides……………2" (50mm)
Top....................2" (50mm)
Back..................2" (50mm)
Do not o ver fill your Beverage Center for proper cooling.