39SKYLINE 10'X12' DOUBLE-TIER GAZEBO
STEP 25
21
20
19
2 3 4 5
21
19
21
21
20
21
21
X8
B
X32
20
X2
19
X2
NOTE:
Install all bolts by hand loosely
threaded BEFORE fully tightening
any bolts. Once all bolts are installed
loosely, then secure the bolts before
moving on to the next step.
NOTE:
Place roof edge caps (Parts 19,
20, & 21) over the ends of the
roof panels as shown below.
NOTE:
No bolts get installed in
the holes at these locations
marked with X’s.
X8
39SKYLINE 10'X12' DOUBLE-TIER GAZEBO
STEP 25
21
20
19
2 3 4 5
21
19
21
21
20
21
21
X8
B
X32
20
X2
19
X2
B
NOTE:
Install all bolts by hand loosely
threaded BEFORE fully tightening
any bolts. Once all bolts are installed
loosely, then secure the bolts before
moving on to the next step.
NOTE:
Place roof edge caps (Parts 19,
20, & 21) over the ends of the
roof panels as shown below.
X32
NOTE:
No bolts get installed in
the holes at these locations
marked with X’s.
X8