Do you have a question about the Carrier 19DH and is the answer not in the manual?
Critical safety protocols for hazardous materials and operations.
Safety measures for electrical, mechanical, and general operational hazards.
Cautions for safe practices, equipment handling, and risk mitigation.
Overview of the manual and required job specifications.
General steps prior to machine start-up, including tightness and dehydration.
Lubrication of mechanical parts, safety devices, flushing, and piping inspection.
Inspection of wiring, turbine operation, water circuits, and level controller settings.
Procedures for refrigerant charging, coupling alignment, and safety control verification.
Calibration of the load limiting control assembly and its components.
General start-up guidelines and compressor oil preparation steps.
Adjusting suction damper, pressurizing labyrinths, and performing final pre-start checks.
Step-by-step start-up guide and adjustments for refrigerant charge and levels.
Performing hot alignment, stopping the machine, and purge operations.
Detailed instructions for operating pumpout units on 5F and 6D models.
Procedures for charging refrigerant and operator training.