CHECK VALVES 
Two in-line check valves, one for each refrigerant 
circuit, are shipped loose with each 30HS unit for 
field installation in discharge piping to remote 
condenser(s). Mount each valve 
close to the unit, 
in a horizontal position, with the bonnet up. 
FLOW SWITCHES 
For each unit (30HR,HS070-160), a flow switch 
is factory provided, but must be field installed. For 
installation, attach conduit as shown in Fig. 2. 
COOLER 
Cooler water inlet and outlet connections are 
standard 150 pound ASA flanges (see Fig. 1). 
Chilled water temperature controller sensing bulb 
is factory installed in the 
return 
water nozzle for 
return 
water control. 
If 
leaving 
water control is required, cams in 
controller must be reset and the sensing bulb must 
be installed in the 
leaving 
water nozzle. 
Otherwise, 
do not relocate bulb. 
See Carrier System Design Manual, Part 3, piping 
Design for chilled water piping details. 
Plan piping for minimum number of changes in 
elevation. Install manual or automatic vent valve at 
high points in line. Maintain system pressure by 
using a pressure tank or combination relief and 
reducing valve. 
Install thermometers in entering and leaving 
lines. Provide drain connections at all low points to 
permit complete drainage of system. Connect shut-
off valve to drain line before operating unit. Install 
shutoff valves near entering and leaving water con- 
nections. Use flexible connections on condenser 
and cooler piping to reduce vibration transmission. 
Insulate piping after leak testing to prevent heat 
gain and sweating. Cover insulation with moisture 
seal. 
ELECTRICAL 
All field wiring must comply with local code 
requirements. Electrical data for the complete unit 
and for individual compressors is in Table 2. 
Control circuit voltage is 115 volts for all 60-
Hertz units. Accessory transformer permits control 
power to bt taken directly from unit power terminal 
block (see Fig. 3). Transformer wiring instructions 
are furnished with accessory package. 
All units, for all voltages, are wired for across-
the-line start. 
FIELD POWER SUPPLY 
TO 
CIRCUIT 
BREAKERS 
OPTIONAL 0.75 KVA 
TRANSFORMER 
— 
_c 
GROUND 
Connection details furnished with accessory transformer 
package. 
Fig. 3 — Accessory Transformer Connections 
START-UP AND SERVICE 
INITIAL CHECK 
IMPORTANT: Do not at 
even momentarily, until the followin 
been completed. 
1. Electrical power source must agree with unit 
nameplate rating. 
2. 
Check all auxiliary comp'onents such as circu-
lating pumps, air handling equipment, or other 
equipment connected to chiller. Consult manu-
facturer's instructions. 
3. 
Check chilled water safety thermostat. See 
Safety Thermostat for adjustment. 
4.  Backseat (open) compressor suction and dis-
charge shutoff valves. Close valves one turn to 
allow some pressure to each test gage (if 
installed). 