EasyManuals Logo

Carrier 30HL User Manual

Carrier 30HL
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Carrier
Parkway
Syracuse
NY
13221
Reciprocating
Liquid
Chillers
(60
Hz)
All
208/230-volt
units
have
extended-voltage
compressor
motors.
All
units
have
suction-cutoff
unloading
system.
CONTENTS
Page
SAFETY
CONSIDERATIONS.
I
INSTALLATION.1-6
Step
1
Inspect
Shipment.
1
Step
2
Rig
and
Place
Unit.
I
RIGGING
PLACEMENT
Step
3
Check
Compressor
Mounting
and
Connections.
3
SERVICE
ACCESS
Step
4
Make
Piping
Connections.
3
CONDENSER
DESCRIPTION
CONDENSER
PIPING
COOLER
DESCRIPTION
COOLER
PIPING
Step
5
Make
Electrical
Connections
.
4
ELECTRICAL
BOX,
CONTROL
SECTION
UNBALANCED
3-PHASE
SUPPLY
VOLTAGE
ELECTRICAL
BOX,
POWER
SECTION
START-UP
AND
SERVICE.
6
Initial
Check.
6
Check
Refrigerant
Charge.
6
LIQUID
CHARGING
METHOD
Check
Oil
Charge.
7
TO
ADD
OIL
TO
REMOVE
OIL
START-UP.7-10
Check
Refrigerant
Feed
Components.
7
THERMOSTATIC
EXPANSION
VALVE
FILTER
DRIER
MOISTURE-LIQUID
INDICATOR
LIQUID-LINE
SERVICE
VALVE
LIQUID-LINE
SOLENOID
VALVE
PRESSURE
RELIEF
DEVICES
CHECK
VALVE
Check
Compressor
Protection
Devices.
8
CIRCUIT
BREAKER
MOTOR
OVERTEMPERATURE
THERMOSTAT
CRANKCASE
HEATER
TIME
GUARD®
CONTROL
FOUR-FUNCTION
TIMER
OIL
PRESSURE
SAFETY
SWITCH
(OPS)
Check
Unit
Safety
Devices.9
SAFETY
THERMOSTAT
HIGH-PRESSURE
SWITCH
LOW-PRESSURE
SWITCH
Check
Capacity
Control
System.
10
DESCRIPTION
3-STEP
TEMPERATURE
CONTROLLER
DESIGN
SET
POINT
ADJUSTMENT
CYLINDER
UNLOADING
SYSTEM
Page
UNIT
OPERATION.10-11
Control
Power.
10
Control
Sequence.
11
Unit
Stoppage
and
Restart.
11
SERVICING
COOLER.11-13
Tube
Plugging.
12
Retubing
.
12
Tightening
Cooler
Head
Bolts
.
12
GASKET
PREPARATION
BOLT
TORQUES
BOLT
TIGHTENING
SEQUENCE
TROUBLESHOOTING
GUIDE.14,15
SAFETY
CONSIDERATIONS
Installation,
start-up
and
servicing
of
this
equipment
can
be
hazardous
due
to
system
pres¬
sures,
electrical
components
and
equipment
location
(roofs,
elevated
structures,
etc.).
Only
trained,
qualified
installers
and
service
mechanics
should
install,
start-up
and
service
this
equipment.
When
working
on
the
equipment,
observe
pre¬
cautions
in
the
literature,
tags,
stickers
and
labels
attached
to
the
equipment
and
any
other
safety
precautions
that
apply.
Follow
all
safety
codes.
Wear
safety
glasses
and
work
gloves.
Use
care
in
handling,
rigging
and
setting
bulky
equipment.
INSTALLATION
Step
1
Inspect
Shipment
Inspect
unit
for
damage
or
missing
parts.
If
dam¬
age
is
detected,
or
if
shipment
is
incomplete,
file
a
claim
immediately
with
the
shipping
company.
Step
2
Rig
and
Place
Unit
RIGGING
On
each
end
of
cooler,
a
steel
loop
is
provided
for
the
preferred
method
of
lifting
unit.
Use
spreader
bars
to
keep
cables
away
from
compressor
enclo^
sure
and
control
box.
If
unit
is
to
be
moved
by
fork
truck,
use
the
following
methods:
1.
From
front
or
rear,
lift
under
the
cooler
rails.
Unit
can
be
either
on
or
off
skid.
2.
When
moving
from
ends,
leave
unit
on
skid.
Lift
from
under
skid.
©
Carrier
Corporation
1983
Form
30HK,HL-10SI

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Carrier 30HL and is the answer not in the manual?

Carrier 30HL Specifications

General IconGeneral
BrandCarrier
Model30HL
CategoryChiller
LanguageEnglish

Related product manuals