Tabie
5
Electrical
Data;
3-Phase,
60-Hertz
COMPLETE
UNIT
VOLTS
Nameplate
208/230*
460
575
COMPRESSOR
06E
USAGE*
Supply
Rangel
187-253
414-508
518-632
UNIT
30
!
i
MCA
Max
Fuse
Amps
MCA
1
Max
Fuse
Amps
MCA
I
Max
Fuse
Amps
MKW
015
1
16.4
69
110
34
}
60
29
!
50
C537**
020
1
21.8
79
125
36
1
60
34
i
60
2150
025
29.0
103
175
50
j
90
45
80
7265
030
i
31.0
115
200
50
i
90
49
I
80
7175
015
1
19.1
125
38
1
60
30
50
0537**
HL
020
I
252
90
150
42
1
70
38
60
2250
025
I
31.8
115
50
1
90
45
80
7265
030
1
35.9
140
250
62
j
53
90
7275
INDIVIDUAL
COMPRESSORS
UNIT
30
COMPRESSOR
208/230V*
460
V
575
V
06|
Kw
RLA
LRA
MTA
RLA
LRA
MTA
RLA
LRA
MTA
015
0537**
16.4
55
266
77
27
120
37
23
96
31
HK
020
2150
21.8
63
283
88
29
142
40
27
98
37
025
7265
29.0
82
446
1
14
40
223
56
36
164
50
030
7175
31.0
92
446
128
40
223
56
39
164
54
015
0537**
19.1
64
266
89
30
120
41
24
96
33
HL
020
2250
25.2
72
345
100
33
173
46
30
120
42
025
7265
31.8
92
446
128
40
223
56
36
164
50
030
7275
35.9
112
506
156
49
253
.68.
42
176
58
KW
Maximum
Power
Input
(compressor)
LRA
Locked
Rotor
Am.ps
MCA
Mm
imum
Circuit
Amps
(for
wire
sizing).
Complies
with
National
Electrical
Code
(NEC)
Section
430-24.
MKW
Unit
power
input
at
operating
conditions
of
50
F
Leaving
Chilled
Water
Temperature
(44F
Saturated
Suction
Temperature)
and
120F
(FIK)
or
145F
(HL)
Saturated
Discharge
Temperature.
MTA
Must
Trip
Amps
(factory-installed
circuit
breaker)
RLA
Rated
Load
Amps
START-UP
AND
SERVICE
WARNING;
Shut
off
all
power
to
unit
before
proceeding
with
any
service
work.
Initial
Check
Do
not
attempt
to
start
the
liquid
chiller
even
momentarily
until
the
following
steps
have
been
completed.
1.
Check
all
auxiliary
components
such
as
chilled
liquid
circulating
pump,
cooling
tower
if
used,
air
handling
equipment,
or
other
equipment
to
which
chiller
supplies
liquid.
Consult
manu¬
facturer’s
instructions.
2.
Checksafety
thermostat.
See
Safety
Thermostat.
3.
Determine
if
there
is
a
refrigerant
charge
in
the
system.
Refer
to
Check
Refrigerant
Charge.
4.
Backseat
(open)
compressor
suction
and
dis¬
charge
shutoff
valves.
5.
Open
liquid
line
shutoff
valves.
6.
Open
valves
to
capillaries
of
water-regulating
valve
(when
used).
1090
"Compressors
in
ai!
models
have
extended
voltage
motor,
fUnits
are
suitable
for
use
on
electrical
systems
where
voltage
supplied
to
the
unit
terminals
is
not
below
or
above
the
range
limits
shown.
iPrefix:
2=1
electric
unloader;
C,
7
=
2
electric
unloaders.
*"30HK,FIL015
models
use
06D
compressor
instead
of
06E
compressors.
7.
Fill
chilled
liquid
circuit
with
clean
water
or
other
noncorrosive
fluid
to
be
cooled.
Bleed
all
air
out
of
high
points
of
system.
8.
Open
supply
valve
(or
fill
cooling
tower
if
used)
for
condenser
cooling
water.
9.
Set
temperature
controller.
10.
Check
tightness
of
all
electrical
connections.
11.
Be
sure
compressor
is
floating
freely
on
the
isolation
springs.
See
Installation,
Step
3.
12.
Check
compressor
oil
(should
be
visible
in
bull’s-eye).
Refer
to
Check
Oil
Charge.
13.
Be
sure
crankcase
of
each
compressor
is
warm
(heaters
should
be
on
for
24
hours
before
start¬
ing
compressors).
Check
Refrigerant
Charge
1MP()R'I
\N1,
Do
not
open
liquid
vahe
(u
compressor
discharge
val\e
until
there
is
a
charge
in
lematndei
ol
svstem
-X
positive
pres¬
sure
will
indicate
a
charge
m
system.

Related product manuals