EasyManua.ls Logo

Carrier 30RA070B User Manual

Carrier 30RA070B
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
30RA 040-240 "B"
Air-Cooled Liquid Chillers with
Integrated Hydronic Module
Nominal cooling capacity 39-245 kW
50 Hz
Installation, operation and maintenance instructions
AQUASNAP
For the operation of the control please refer to
the Pro-Dialog
Control manual for the
30RA/RH - RY/RYH "B" series
Carrier is participating in the
Eurovent Certification Programme.
Products are as listed in the
Eurovent Directory of Certified
Products.
Question and Answer IconNeed help?

Do you have a question about the Carrier 30RA070B and is the answer not in the manual?

Carrier 30RA070B Specifications

General IconGeneral
Model30RA070B
TypeAir-cooled Chiller
CategoryChiller
Cooling Capacity200 kW
RefrigerantR-410A
Compressor TypeScroll
Power Supply400V/3ph/50Hz
Operating Range-10°C to 45°C

Summary

1 - Introduction

1.1 - Installation Safety Considerations

Machine installation location must be secure and accessible only to authorized personnel.

1.2 - Equipment and Components Under Pressure

Products include pressurized components; consult relevant trade associations for specifications and requirements.

1.3 - Maintenance Safety Considerations

1.4 - Repair Safety Considerations

Faults and leaks must be repaired promptly by authorized technicians; safety devices must be re-checked.

2 - Preliminary Checks

2.1 - Equipment Receipt Verification

Inspect unit for damage or missing parts, and confirm received unit matches order specifications.

2.2 - Unit Moving and Siting

Ensure adequate space, proper lifting points, site stability, and protection from environmental factors.

6 - Application Data

6.1 - Unit Operating Range

Defines the minimum and maximum operating temperatures for evaporator and condenser.

7 - Electrical Connection

9 - Water Connections

10 - Nominal System Water Flow Control

11 - Start-Up

11.1 - Preliminary Checks

Essential pre-operation checks including refrigerant leaks, connections, and pump status.

11.2 - Actual Start-Up

Procedures for commissioning and initial operation supervised by qualified personnel.

12 - Maintenance

12.2 - Refrigerant Charge

Procedures for verifying and maintaining the correct R407C refrigerant charge.

13 - Aquasnap Maintenance Program

14 - Start-Up Checklist for 30RA Liquid Chillers

Related product manuals