EasyManua.ls Logo

Carrier 38AUD - Page 17

Carrier 38AUD
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
This unit is designed for use with Puron (R--410A)
refrigerant. Do not use any other refrigerant in this
system.
Puron (R--410A) refrigerant is provided in pink (rose)
colored cylinders. These cylinders are available with and
without dip tubes; cylinders with dip tubes will have a
labe l indicating this feature. For a cylinder with a dip
tube, place the cylinder in the upright position (access
valve at the top) when removing liquid refrigerant for
charging. For a cylinder without a dip tube, invert the
cylinder (access valve on the bottom) when removing
liquid refrigerant.
Because Puron (R--410A) refrigerant is a blend, it is
strongly recommended that refri gerant a lways be removed
from the cylinder as a liquid. Admit liquid refrigerant into
the system in t he discharge line. If adding refrigerant into
the suction line, use a commercial metering/expansion
devic e at the gauge manifold; remove liquid from the
cylinder, pass it through the metering device at the gauge
set and then pass it into the suction line as a vapor. Do not
remove Puron (R--410A) refrigerant from the cylinder as a
vapor.
Preliminary Charge
Before starting the unit, charge R-410A liquid refrigerant
into the high side of each 38AU circuit through the liquid
service valve(s). The amount of refrigerant added must be
at least 80% of the operating charge listed in Tables 5 or 6
for LINEAR line length LESS the factory charge quantity
(if factory shipping charge has not been removed). See
example below.
Allow hig h and low side pr es s u res to equalize. If pres s u res
do not equalize readily , charge R-410A vapor (using special
serv ice manifold with expansio n device) into the suction line
service port for the low side of system to assure charge in
the evaporator . Refer to GTAC II, M odule 5, Charging,
Recov er, Recyclin g, and Reclamation fo r liquid charg ing
procedures.
Example (using Tables 5 and 6):
Unit 38AUZA08 with Novation coil
Linear line length 25 m
Estimated equivalent line length 37 m (add 50% to linear
length)
Liquid lift 8 m (indoor unit above outdoor unit)
See Table 5, 38AUZ models, for line sizes and system
operating charge. Enter table in Equivalent Length column
for 34-46 m.
Liquid line size: Note that a DNU code (Do Not Use)
applies to
1
/
2
-in. OD tube with Novation c oil opti on for
unit 38AUZ*08. Check liquid lift capability of
5
/
8
-in OD
tube a gainst project requirements. Table 5 indicates
5
/
8
-in
tube allows 10 m lift which exceeds job requirements.
(Note: If maximum liquid lift value is not greater than
project requirements, STOP. Select a new location for the
outdoor unit that reduces lift and/or length requirements
or select a unit model with RTPF c oil option.)
Suction line size: Select 1-
1
/
8
-in. OD tube for t his line
length.
Note Operating Charge quantity: 9.9 kg.
Start-up Charge Calculation
Target start-up charge quantity is 80% of Operating
Charge quantity:
Start-up Charge = 0.80 x 9.9 = 7.9 kg (use for recharge
situation)
Deduct Shipping Charge if still available (new unit
installation):
Shipping Charge (from Table 1A): 2.2 kg
Field-Add for Start-up: 7.9 2.2 = 5.7 kg (use for new
unit installation)
EN Units:
38AUZA08 with Novation coil
Linear lengt h 82 ft
Equivalent length 123 ft
Liquid lift 25 f t
Select liquid line as 5/8-in OD , suctio n line as 1-
1
/
8
-in OD.
Note Op eratin g Charg e quantity: 2 1.9 lbs
Start-up Charge Calculation
Target start-up charge quantity is 80% of Operating
Charge quantity:
Start-up Charge = 0.80 x 21.9 = 17.5 l bs (use for
recharge situation)
Deduct Shipping Charge if still available (new unit
installation):
Shipping Charge (from Table 2A): 4.6 lbs
Field-Add for Start-up: 17.5 4.6 = 12.9 lbs (use for
new unit installation)
38AU

Table of Contents

Related product manuals