EasyManuals Logo

Carrier 42QHC024D8S Series Service Manual

Carrier 42QHC024D8S Series
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #55 background imageLoading...
Page #55 background image
24
14.1.7 Re-installation while the outdoor unit need to be repaired
1. Evacuation for the whole system
Procedure:
1). Confirm that both the 2-way and 3-way valves are set to the opened position.
2). Connect the vacuum pump to 3-way valve’s service port.
3). Evacuation for approximately one hour. Confirm that the compound meter indicates -0.1Mpa.
4). Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge
needle does not move (approximately 5 minutes after turning off the vacuum pump).
5). Disconnect the charge hose from the vacuum pump.

Other manuals for Carrier 42QHC024D8S Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Carrier 42QHC024D8S Series and is the answer not in the manual?

Carrier 42QHC024D8S Series Specifications

General IconGeneral
BrandCarrier
Model42QHC024D8S Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals