EasyManua.ls Logo

Carrier 50JZ - Page 10

Carrier 50JZ
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
condensate connection to ensure proper drainage. Condensate trap
is available as an accessory or is field-supplied. Make sure that the
outlet of the trap is at least 1 in. (25.4 mm) lower than the unit
drain condensate connection to prevent the drain from overflow-
ing. Connect a drain trough using a minimum of field-supplied
3/4-in. PVC (19.05 mm) or copper pipe at outlet end of the 2-in.
(50.8 mm) trap (See Fig. 12). Do not undersize the tube. Pitch the
drain trough downward at a slope of at least 1 in. (25.4 mm) every
10 ft. (3.05 m) of horizontal run. Be sure to check the drain trough
for leaks. Prime the trap at the beginning of the cooling season
start-up.
Table 3—Minimum Airflow for Reliable Electric Heater Operation
AIRFLOW 50JZ024 50JZ030 50JZ036 50JZ048
CFM 800 1000 1200 1600
L/s 378 472 567 756
Fig. 10—Typical Installation
C02003
INDOOR
THERMOSTAT
DISCONNECT
PER IEC*
FROM
POWER
SOURCE
RETURN
AIR
TOP COVER
Fig. 11—50JZ with Duct Covers On
C00092
Duct Covers
10

Other manuals for Carrier 50JZ

Related product manuals