EasyManua.ls Logo

Carrier 50ZH042 - User Manual

Carrier 50ZH042
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
50ZH030-060
3-Phase Packaged Heat Pump
Visit "vv'vv'vv.12_lrri_r.L"oin
installation, Start-Up and Service instructions
HEATING & COOLING
NOTE: Read the entire instruction manual belk_re starting the
installation.
TABLE OF CONTENTS
SAFETY CONS1 f)ERATIONS ..................................................... ]
INTRODUCTION .......................................................................... 2
RECEIVING AND INSTALLATION .......................................... 2
Check Equipn_ent ...................................................................... 2
IDENTIFY UNIT ................................................................ 2
INSPECT SHIPMENT ........................................................ 2
Provide Unit Support ................................................................ 2
SLAB MOUNT ................................................................... 2
GROUND MOUNT ............................................................ 2
Provide Clearances .................................................................... 2
Place Unit .................................................................................. 2
Select and Install Ductwork ..................................................... 2
INSTALL FLANGES FOR DUCTWORK CONNEC-
TIONS (50ZH060 ONLY) .................................................. 2
CONVERTING HORIZONTAL DISCHARGE UNITS TO
DOWNFLOW (VERTICAL) DISCHARGE ...................... 6
Provide liar Condensate Disposal ............................................. 6
Install Electrical Connections ................................................... 7
HIGH-VOLTAGE CONNECTIONS .................................. 7
ROUTING POWER LEADS INTO UNIT ........................ 7
CONNECTING GROUND LEAD TO UNIT GROUND.7
ROUTING CONTROL POWER WIRES .......................... 7
ACCESSORY ELECTRIC HEAT WIRING ..................... 7
SPECIAL PROCEDURES FOR 208-V OPERATION .....7
PRE-START-UP ............................................................................ 9
START-UP ..................................................................................... 9
Check lor Refi"igerant Leaks .................................................... 9
LOCATE AND REPAIR REFRIGERANT LEAKS AND
CHARGE THE UNIT AS FOLLOWS: ............................. 9
Start-Up Cooling Section and Make Adjustnlents ................ 10
CHECKING COOLING CONTROL OPERATION ....... 10
COMPRESSOR ROTATION ........................................... 10
Refrigerant Charge .................................................................. 10
NO CHARGE .................................................................... 10
LOW CHARGE COOLING ............................................. 10
TO USE THE COOLING CHARGING CHART ............ 11
HEATING MODE CHARGE ........................................... 11
Indoor Airflow and Airflow Adjustn-ients .............................. IX
FOR 208/230-V ................................................................. 11
FOR 460-V MOTORS ...................................................... 11
Unit Controls ........................................................................... l l
HIGH-PRESSURE RELIEF VALVE ............................... IX
LOSS OF CHARGE SWITCH ......................................... 11
COMPRESSOR OVERLOAD .......................................... 11
Sequence of Operation ............................................................ 14
FAN OPERATION ............................................................ 14
COOLING .......................................................................... 14
HEAT PUMP HEATING .................................................. 14
DEFROST .......................................................................... 14
ELECTRIC RESISTANCE HEATING ............................ 14
C00155
Fig. 1--Unit 50ZH
MAINTENANCE ......................................................................... 14
Air Filter .................................................................................. 16
Unit Top Removal (Outdoor-Coil Side) ................................ 16
Indoor Blower and Motor ....................................................... 16
Outdoor Coil, Indoor Coil and Condensate Drain Pan ........ 17
Outdoor Fan ............................................................................ 19
Electrical Controls and Wiring ............................................... 19
ReliTigerant Circuit .................................................................. 19
Indoor Airflow ........................................................................ 19
Metering Devices .................................................................... 19
Lubrication .............................................................................. 19
Liquid Line Strainer ................................................................ 19
High Flow Valves ................................................................... 19
TROUBLESHOOTING ............................................................... 22
START-UP CHECKLIST ............................................................ 23
NOTE TO 1NSTALLER--Beli_re installation, READ THESE
INSTRUCTIONS CAREFULLY AND COMPLETELY. Also,
make sure the User's Manual and Replacement Guide are leli with
the unit alier installation.
SAFETY CONSIDERATIONS
Installation and servicing of air-conditioning equipment can be
hazardous due to system pressure and electrical components. Only
trained and qualified workers should install, repair, or service
air-conditioning equipment.
Untrained workers can perlimn basic maintenance hlnctions of
cleaning coils and l]lters. All other operations should be perlormed
by trained service people. When working on air-conditioning
equipment, pay attention to precautions in the literature, tags, and
labels attached to the unit, and other sali_ty precautions that may
apply.
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
PC 101 Printed in U.S.A. Catalog No. 50ZH-6SI Pg 1 2-06 Replaces: New
Question and Answer IconNeed help?

Do you have a question about the Carrier 50ZH042 and is the answer not in the manual?

Carrier 50ZH042 Specifications

General IconGeneral
BrandCarrier
Model50ZH042
CategoryHeat Pump
LanguageEnglish

Summary

SAFETY AND INTRODUCTION

INTRODUCTION TO 50 ZH UNITS

General overview of the 50ZH heat pump units.

RECEIVING AND INSTALLATION OVERVIEW

Covers unit inspection, support, clearances, and placement.

INSTALLATION AND WIRING

DUCTWORK INSTALLATION AND FLANGES

Guidelines for selecting, installing ductwork, and flanges.

CONDENSATE DISPOSAL AND CONVERSION

Procedures for condensate disposal and unit discharge conversion.

ELECTRICAL CONNECTIONS AND WIRING

Instructions for making high-voltage and control wiring connections.

PRE-START-UP PROCEDURES

REFRIGERANT LEAK DETECTION

Procedures for detecting and repairing refrigerant leaks.

START-UP PROCEDURES

COOLING CONTROL OPERATION CHECK

Verifies proper operation of cooling controls.

COMPRESSOR ROTATION VERIFICATION

Ensures correct compressor rotation direction.

REFRIGERANT CHARGE ADJUSTMENT

Details on checking and adjusting the refrigerant charge.

INDOOR AIRFLOW ADJUSTMENTS

Procedures for checking and adjusting indoor airflow.

MAINTENANCE PROCEDURES

AIR FILTER INSPECTION AND REPLACEMENT

Instructions for inspecting and replacing the air filter.

INDOOR BLOWER AND MOTOR SERVICE

Guidance on cleaning the indoor blower and motor.

COIL AND DRAIN PAN CLEANING

Procedures for inspecting and cleaning coils and drain pan.

TROUBLESHOOTING AND SUPPORT

TROUBLESHOOTING COMMON ISSUES

Lists common symptoms, causes, and remedies for issues.

START-UP CHECKLIST

A checklist for essential pre-operation checks.

Related product manuals