CHECKLIST—INSTALLATION
LOAD CALCULATION
________ Heating Load (Btuh)
________ Cooling Load (Btuh)
________ Furnace Model Selection
AIR FOR COMBUSTION AND VENTILATION
________ Unconfined Space
________ Confined Space
VENTING
________ NFGC (United States)
________ NSCNGPIC (Canada)
________ Local Codes
________ 1/4-in. Upward Slope
________ Joints Secure
________ See Attached Vent Table Instructions
CHECKLIST—START-UP
________
Gas Input Rate
(Set Within 2 percent of Rating
Plate)
________ Temperature Rise Adjusted
________
Thermostat Anticipator Setting Ad-
justed or
________
Thermostat Cycle Rate (3 Cycles per
Hr) Selected
CHECK SAFETY CONTROLS OPERATION
________ Primary Limit
________ Pressure Switches
________ Draft Safeguard Switch
________
Auxiliary Limit Switch(es)
23