CHECKLIST—INSTALLATION
LOAD CALCULATION
____________ Heating Load (Btuh)
____________ Cooling Load (Btuh)
____________ Furnace Model Selection
AIR FOR COMBUSTION AND VENTILATION
____________ Unconfined Space
____________ Confined Space
VENTING
____________ NFGC (United States)
____________ NSCNGPIC (Canada)
____________ Local Codes
____________ 1/4-in. Upward Slope
____________ Joints Secure
____________ See Attached Vent Table Instructions
CHECKLIST—START-UP
____________
Gas Input Rate
(Set Within 2 percent of Rating Plate)
____________ Temperature Rise Adjusted
____________ Thermostat Anticipator Setting Adjusted or
____________ Thermostat Cycle Rate (3 cycles per Hr)
CHECK SAFETY CONTROLS OPERATION
____________ Primary Limit
____________ Pressure Switches
____________ Draft Safeguard Switch
____________ Auxiliary Limit Switch(es)