EasyManuals Logo

Carrier 58CVA User Manual

Carrier 58CVA
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1
58CVA/CVX
V a r i a b l e --- S p e e d , I n d u c e d --- C o m b u s t i o n D e l u x e
4---Way Multipoise Gas Furnace
Series 160
Installation, Start---up, Operating and
Se rvice and Maint e nance Ins truct io ns
SAFETY CONSIDERATIONS 2........................
INTRODUCTION 4..................................
CODES AND STANDARDS 4..........................
Safety 4...........................................
General Installation 4................................
Combustion and Ventilation Air 4......................
Duct Systems 4.....................................
Acoustical Lining and Fibrous Glass Duct 4...............
Gas Piping and Gas Pipe Pressure Testing 4...............
Electrical Connections 4..............................
Venting 4.........................................
ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS
PROCEDURE 4.....................................
LOCATION 5.......................................
AIR FOR COMBUSTION AND VENTILATION 8.........
Outdoor Combustion Air Method 9....................
The Standard Method: 9............................
Combination of Indoor and Outdoor Air 10.............
INSTALLATION 10..................................
Bottom Return Air Inlet 10..........................
Side Return Air Inlet 10.............................
Leveling Legs (If Desired) 11........................
Bottom Return Air Inlet 11..........................
Suspended Furnace Support 11.......................
Platform Furnace Support 11.........................
Roll--Out Protection 12.............................
Bottom Return Air Inlet 12..........................
Side Return Air Inlet 12.............................
Filter Arrangement 13..............................
AIR DUCTS 13......................................
General Requirements 13............................
Ductwork Acoustical Treatment 13....................
Supply Air Connections 14..........................
Upflow and Horizontal Furnaces 14...................
Downflow Furnaces 15.............................
Return Air Connections 18..........................
Downflow Furnaces 18.............................
Upflow and Horizontal Furnaces 18...................
GAS PIPING 19.....................................
ELECTRICAL CONNECTION 20.......................
ACCESSORIES 22...................................
VENTING 22.......................................
START--UP, ADJUSTMENT, AND SAFETY CHECK 34.....
General 34........................................
Start--Up Procedures 37..............................
Adjustments 37.....................................
Check Safety Controls 45.............................
Checklist 46.......................................
SERVICE AND MAINTENANCE PROCEDURES 46.......
General 46........................................
Care and Maintenance 47.............................
Sequence of Operation 52.............................
Wiring Diagram 56..................................
Troubleshooting 56..................................
Accessory List 59...................................
PARTS REPLACEMENT INFORMATION GUIDE 60.......
Always Ask For
Use of the AHRI Certified TM Mark indicates a
manufacturer’s participation in the program. For
verification of certification for individual products,
go to www.ahridirectory.org.
NOTE: Read the entire instruction manual before starting the
installation.
Portions of the text and tables are reprinted from NFPA 54/ANSI
Z223.1--2009E, with permission of National Fire Protection
Association, Quincy, MA 02269 and American Gas Association,
Washington DC 20001. This reprinted material is not the
complete and official position of the NFPA or ANSI on the
referenced subject, which is represented only by the standard in
its entirety.

Questions and Answers:

Carrier 58CVA Specifications

General IconGeneral
Model58CVA
Blower TypeVariable-Speed
Motor TypeECM
Ignition TypeHot Surface Ignition
Fuel TypeGas
Heating Capacity40, 000 to 130, 000 BTU/h
StagesTwo-Stage
Warranty10-year parts warranty

Related product manuals