EasyManua.ls Logo

Carrier i-Vu CIV-OR - Installation and Mounting Procedures

Carrier i-Vu CIV-OR
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the i-Vu® Open Router
i-Vu® Open Router CARRIER CORPORATION ©2020
Installation and Start-up Guide All rights reserved
4
1 Mount the i-Vu® Open Router (page 4).
2 Wire for power (page 5).
3 Set the i-Vu® Open Router's address and IP address (page 6).
4 Wire for communications (page 10).
5 Communicate through the Local Access port (page 12).
6 Configure BACnet Device Instance and network number (page 15).
Mounting the i-Vu® Open Router
WARNING
When you handle the i-Vu® Open Router:
Do not contaminate the printed circuit board with fingerprints, moisture, or any foreign material.
Do not touch components or leads.
Handle the board by its edges.
Isolate from high voltage or electrostatic discharge.
Ensure that you are properly grounded.
Screw the i-Vu® Open Router into an enclosed panel using the mounting slots on the cover plate. Leave about 2
in. (5 cm) on each side of the controller for wiring.
Installing the i-Vu® Open Router