Engine-Engineandcrankcase
58.1.Installtheradar(ifequipped).
2.Connecttheradarelectricalconnector(if
equipped).
BAIL13TR01648AB54
59.Installthefronthitchhydraulicpipes.
BAIL13TR01647AB55
60.Connectthefronthitchhydraulicpipestothemid-
mountvalve.
BAIL13TR01645AB56
Allvehicles
61.Fillthetransmissionwithoil.
Nextoperation:
Installtheleft-handfueltank,seeFueltank-Install(10.216).
Nextoperation:
Installtheselectivecatalyticreduction(SCR)mufer,seeSelectiveCatalyticReduction(SCR)muferandcatalyst
-Install(10.500).
Nextoperation:
Filltheenginecoolingsystem,seeEnginecoolingsystem-Filling(10.400).
Nextoperation:
Rechargetheairconditioningsystem,seeAirconditioning-Charging(50.200).
Nextoperation:
Connectthebattery,seeBattery-Connect(55.302).
Nextoperation:
Bleedthebrakes,seeHydraulicservicebrakes-Bleed(33.202).
Nextoperation:
4793872419/10/2015
10.1[10.001]/33