2.0 COMMISSIONING CHECK
LIST
L
2.1 PRE-LAUNCH CHECK
:
1. SHAFT TURNS FREELY BY HAND, ZINC COLLAR INSTALLED IF REQUIRED
2.
CHECK INTAKE HOSES AND CLAMPS
3.
CHECK ALL THROUGH FULL FITTINGS
-
-
-
4.
DMIN
PLUGS TIGHT, ENGINE, MUFFLER, AND EXHAUST LINE
5.
BOTTOM
CLEAN,
PAINTK
6.
HULL
SIDES
CLEAN,
GEL
COAT
OK
7.
DECKS CLEAN
8. TEAK CLEANED AND OILED
9.
INTERIOR FINISHED, OILED, CLEAN
10. CUSHIONS, CARPETING, CURTAINS, CLEAN AND IN PLACE
11. TABLE CONVERTS TO BERTH OK, DINETTE, TRADITIONAL TARLE
STOWS
12. HATCH
LIDS
PRESENT
AND
FIT-OK
OK
13. LIFELENES AND PULPITS RIGGED AND OK
14. SPREADERS TAPED AND DRILLED AT BASE
END,UPPER SHROUD WIRED TO
TIP END AND TAPED
15. RIGGING LENGTES
mP.IFIED WITH CHECK LIST IN KIT
16. MAST AND BOOM
1NSPECTED:COTTER PINS, SHEAVES, TANGS,
SPREADER OK
17. MAST LIGHTS CHECKED BEFORE
MAST STEPPED
18. CHECK OVERHEAD FOR ELECTRICAL WIRES
FEICH
MAY
INTERFERE' WITH
THE SPACE REQUIRED TO RAISE THE PAST TO ITS FULL UPRIGHT
POSITION.
IF
THERE ARE WIRES OF ANY KIND ANY WHERE NFAR
THE BOAT, DO NOT RAISE THE MAST. MOVE BOAT TO ANOTHER
LOCATION AWAY FROM ANY WIRES. CONTACT WITH
WIRE'S CAW
BE
FATAL.
2.1 IN WATER CHECK:
2.2.1 ELECTRICAL:
1. ELECTRICAL EQUIPMENT OPERATIONAL:
-
RUNNING CABIN BOW ANCHOR SPREADFRS
PRESSURE-
WATER
MA~TOR
PUMPMASTER
-
2.
SHORE POWER~TLET
3. CHECK BATTERY SWITCH #1
#2-
OK
4.
CHECK
BATTERY
FLUID
LEVK
5.
CBECK BATTFRY TERMINAL FOR TIGHTNESS
2.2.2 PLUMBING:
1. NO LEAKS AT THRU HULL FITTINGS WITH
SEACOCKS OPEN
2. FILL ALL WATER TANKS
3.
CHECK ALL WATER TANKS
4.
TEST ALL FAUCETS AND FOOT PUMPS FOR LEAKS
5.
CHECK FOR LEAKS AT SINK DRAIN, SINK DRAINS OK
6. PUT WATER IN ICE BOX AND CHECK FOR PROPER DRAINAGE
7.
CHECK BILGE PUMP OPERATION, FIANDLE PRESENT
8. CHECK HEAD BY FLUSHING AND PUMPING
9.
CHECK SHOWER SUMP DRAIN LINE
10. CHECK KOLDING TANK, PUMP VENT AND FITTING