EasyManua.ls Logo

CECOR SP50 Series - Section 3 - Installation; Assemble Discharge Connection; Loose Items

CECOR SP50 Series
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
SP50 OPERATIONS MANUAL & PARTS LIST (Rev. 3/2021)
SECTION 3 INSTALLATION
3.1 – ASSEMBLE DISCHARGE CONNECTION
FOR SHIPPING PURPOSE, INSTALLATION OF THE DISCHARGE VALVE AND
QUICK DISCONNECT ADAPTER IS REQUIRED. USE PIPE SEALANT ON ALL
JOINTS AND TIGHTEN SECURELY.
3.2 LOOSE ITEMS
SOME ITEMS MAY BE PACKAGED IN A BOX LOCATED ON THE SHIPPING
PALLET. PACKAGES WITH FILTER BASKET OR FILTER ASSEMBLIES WILL HAVE
FILTERS INSTALLED. PLEASE REVIEW YOUR PACKING LIST TO SEE WHAT
ADDITIONAL ITEMS YOU WILL BE RECEIVING.