SP50 OPERATIONS MANUAL & PARTS LIST (Rev. 3/2021)
3. SETTING SELECTOR VALVE TO DISCHARGE.
3.3.2 – SECURE TANK PORTS
1. CLOSE AND SECURE ALL PORTS INCLUDING THE POT LID, CLEANOUT
DOOR, INTAKE CAP, AND DISCHARGE.
3.3.3 – STARTING ENGINE
1. TURN SELECTOR VALVE TO “VENT” POSITION.
2. OPEN LP TANK VALVE.
3. SET THROTTLE TO HALF AND CHOKE TO FULL