EasyManua.ls Logo

CECOR SP50 Series - Page 20

CECOR SP50 Series
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
SP50 OPERATIONS MANUAL & PARTS LIST (Rev. 3/2021)
4. POSITION FILTER ABOVE CONTAINER INTO WHICH THE SLUDGE IS TO BE
EMPTIED. DISTANCE BETWEEN BOTTOM OF FILTER AND CONTAINER
BOTTOM OR “D” DIMENSION, SHOWN IN FIGURE BELOW, AND SHOULD
BE APPROXIMATELY 2 TO 3 FEET ON F50 TO PREVENT DAMAGE TO
FILTER SLEEVE WHEN DUMPED. DRAINING FILTER BEFORE
POSITIONING AND USING A CONTAINER WITH A DRY BOTTOM AND
SUITABLE CAPACITY WILL HELP REDUCE POSSIBLE FILTER SPLASH
BACK.