EasyManua.ls Logo

Cedar Summit Paramount F25040 - Step 5: Large Fort Floor Assembly; Part 1

Cedar Summit Paramount F25040
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
41 support@cedarsummitplay.com
A: On (2772) Panel Floor Support of the Front/Back Wall measure 20-3/8” from the Swing Wall and 21-7/8” from
Front/Back Wall and 1-1/2” down then pre-drill 2 holes with a 3/16” drill bit. (g. 5.1, 5.2, 5.3 and 5.4)
B: From inside of the assembly centre (2681) Long Floor Joist over pilot holes in (2768) Panel Floor on the End
Wall 5/8” down from the top of board and over the pre-drilled holes in (2772) Panel Floor Support on the Front/
Back Wall, then attach (2681) Long Floor Joist to each board with 2 (S4) #8 x 3” Wood Screws per end. (g. 5.1,
5.2, 5.3 and 5.4)
1 x Long Floor Joist 1-1/4 x 3 x 62-5/8”
4 x #8 x 3” Wood Screw
Step 5: Large Fort Floor Assembly
Part 1
2681
Fig. 5.2
Wood Parts
Fig. 5.1
2681
Top View
Fig. 5.3
Hardware
S4
5/8”
S4
S4
2772
End Wall
End Wall
Front/Back Wall
2768
Front/Back Wall
2681
S4
Fig. 5.4
2768
S4
2681
2681
2772
21-7/8”
20-3/8”
Swing
Wall
Front/Back
Wall
1-1/2”