EasyManua.ls Logo

Cedar Summit Paramount F25040 - Step 8: Install Tunnel Side Upper Jamb

Cedar Summit Paramount F25040
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
50 support@cedarsummitplay.com
A: In the upper opening of the small fort End Wall place 1 (2602) Upper Jamb so it measures 17” to the inside of
each post then attach to (2769) Panel BT Frame and (2768) Panel Floor with 2 Jamb Mounts using 4 (S0) #8 x 7/8”
Truss Screws per mount. (g. 8.1, 8.2, 8.3 and 8.4). Note 1” measurement as noted in g. 8.4.
8 x #8 x 7/8” Truss Screw
Step 8: Install Tunnel Side Upper Jamb
1 x Upper Jamb 1-1/4 x 3 x 35-15/16”
2602
Wood Parts
Hardware
S0
2 x Jamb Mount
Other Parts
Jamb
Mount
S0
x 4 per
Jamb
Mount
Centred
Fig. 8.2
Outside View
Fig. 8.1
Fig. 8.3
Fig. 8.4
2768
End Wall
2602
2769
2768
17”
17”
S0
Jamb
Mount
x 4
2602
No more than 1”
2769
2602
2768
2769