EasyManua.ls Logo

Centroid AcornCNC - Page 5

Default Icon
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Centroid Acorn Plasma Users Manual Beta CNC12 v4.65 rev6
Once the THC boards have been setup in bench test configuration, be sure to Set the THC Installed selection in the
THC configuration menu to “YES”. Found in the Profile Manager.
THC RX and TX Voltage Signal Communication Bench Test
Now Connect a DC power source such as a Battery or Lab Supply to the TX board.
Page 4 D:\Keith Documents\centroid_acorn_plasma_users_manual_draft27.odt rev27 3-15-22
beta draft