EasyManua.ls Logo

Centrometal EKO-CK P 25 - User Manual

Centrometal EKO-CK P 25
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
TECHNICAL MANUAL
for installation, use and maintenance
of the hot water boiler and equipment
for wood pellet burning
TU-PS-10-2020-ENG
EKO-CK P + Cm Pelet-set 14-90
BOOK 1/2
READY
EKO-CKB P + Cm Pelet-set 14-50
HEATING TECHNIQUE
Centrometal d.o.o. - Glavna 12, 40306 Macinec, Croatia, tel: +385 40 372 600, fax: +385 40 372 611
ENG
THE FIRST START-UP MUST BE DONE BY AUTHORIZED PERSON
OTHERWISE PRODUCT WARRANTY IS NOT VALID.
CPPL 14-90 kW

Other manuals for Centrometal EKO-CK P 25

Question and Answer IconNeed help?

Do you have a question about the Centrometal EKO-CK P 25 and is the answer not in the manual?

Summary

General Information

1.1. DESCRIPTION

Overview of the EKO-CK(B) P + Cm Pelet-set hotwater pellet boilers.

1.2. DELIVERY STATUS

Details the components included in the boiler delivery package.

Boiler Components

2.1. BOILER BODY

Describes the steel construction of the EKO-CK P and EKO-CKB P boilers.

2.2. PELLET BURNER CPPL-14, CPPL-35, CPPL-50 AND CPPL-90

Details the specifications and features of the pellet burners used.

2.3. DIGITAL BOILER CONTROLLER CPREG; CPREG-Touch

Explains the functions and characteristics of the digital boiler controller.

2.4. PELLET FEEDER CPPT, CPPT-50 AND CPPT-90

Describes the function of the pellet feeder in transporting pellets to the burner.

2.5. PELLET TANK CPSP; CPSP-800

Describes the positioning and function of the pellet tank.

Boiler Dimensions

Overall system dimensions

Provides key dimensions for various boiler models and their configurations.

Installation and Boiler Assembly

3.0. BOILER POSITIONING AND ASSEMBLY

Guidelines for the correct placement and assembly of the boiler.

3.1 CHANGING OF DOOR OPENING DIRECTION

Instructions on how to change the direction of the boiler door opening.

3.2. INSTALL. OF THE EXTENSION FOR THE INSTALL. OF PELLET BURNER

Details on installing extensions for pellet burner installation.

3.3. PLACING FIRECLAY BOARDS ON THE FIREBOX GRATE

Instructions for placing fireclay boards on the firebox grate.

3.4. OPENING FOR FRESH AIR (FRESH AIR SUPPLY)

Requirements for fresh air openings in the boiler room.

3.5. CONNECTION TO CHIMNEY

Guidelines for connecting the boiler to the chimney system.

3.6. AN EXAMPLE OF SELECTION OF A CHIMNEY

Example of how to select a chimney based on boiler output and height.

3.7. PELLET BURNER MOUNTING

Instructions for mounting the pellet burner to the boiler.

3.8. INSTALLATION OF THE PELLET CONTROLLER

Steps for installing the pellet controller unit.

3.9. LABEL POSITION

Information on the placement of labels for authorized service technicians.

3.10. INSTALLATION OF THE PELLET ANK AND PELLET TRANSPORTER

Details on installing the pellet tank and transporter.

3.11. MOUNTING OF THE TURBULATORS

Instructions for mounting turbulators in flue gas pipes.

Boiler Installation with Central Heating System

4.0. CONNECTING THE BOILER TO THE HEATING SYSTEM

General guidelines for connecting the boiler to heating systems.

4.1. POSSIBLE CONFIGURATIONS OF HYDRAULIC SCHEMES

Reference to hydraulic schemes for boiler configurations.

4.2. BOILER INSTALLATION TO THE CLOSE HEATING SYSTEM

Specific instructions for installing the boiler in a closed heating system.

4.3. BOILER INSTALLATION TO THE OPEN HEATING SYSTEM

Specific instructions for installing the boiler in an open heating system.

4.4. TYPE OF HEATING SYSTEMS - CLOSED AND OPEN HEATING SYSTEMS

Overview of closed and open heating system types for boiler installation.

4.4.1. THERMAL PROTECTION IN AN CLOSED HEATING SYSTEM

Details on installing thermal protection in closed heating systems.

4.5. BOILER CONNECTION EKO - CKB P + CM PELET-SET TO WATER SUPPLY INSTALLATION

Instructions for connecting the boiler to the water supply for DHW.

Electrical, Safety & Operation

5.0. TEMPERATURE REGULATION

Information on using the CPREG/CPREG-Touch for temperature regulation.

6.0. BOILER CONNECTION TO THE ELECTRICAL INSTALLATION

Guidelines for electrical connection of the boiler.

7.0. SAFETY EQUIPMENT

Details the protective mechanisms of the burner and boiler.

Additional Equipment & Commissioning

8.0. ADDITIONAL EQUIPMENT

Information on optional additional equipment for the burners.

8.1. FAN FLAP (ADDITIONAL EQUIPMENT) FOR BURNERS

Details on the fan flap as an additional equipment for specific burners.

9.0. COMMISSIONING

Procedures and checks required before operating the boiler.

Fuel Properties & Boiler Use

10.0. PROPERTIES OF WOODEN PELLETS

Recommended properties of wooden pellets for use in the boilers.

11.0. BOILER USE

Guidelines and safety precautions for operating the boiler.

Cleaning and Maintenance

12.0. CLEANING AND MAINTENANCE OF THE BOILER AND ACCESSORIES FOR BURNING WITH WOOD PELLETS

Instructions for cleaning and maintaining the boiler and its accessories.

Compliance and Notes

EC DECLARATION OF CONFORMITY

Official declaration stating product conformity to EU regulations.

NOTES

Blank page for user notes.

Centrometal EKO-CK P 25 Specifications

General IconGeneral
BrandCentrometal
ModelEKO-CK P 25
CategoryBoiler
LanguageEnglish

Related product manuals