EasyManua.ls Logo

CENTURION SYSTEMS SECTOR II - Default Chapter; Table of Contents

CENTURION SYSTEMS SECTOR II
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
page 3
www.centsys.com
SAFETY
FIRST
IMPORTANT SAFETY INSTRUCTIONS
1. Glossary of terms
2. Product identication
2.1 Internal components
2.2 External components
2.3 Electronics tray
2.4 Hardware unpacking
3. Physical installation
3.1 Orientation of the SECTOR II
3.2 Preparation of the cabinet plinth
3.3 Mounting the cabinet
3.4 Fitting and levelling the boom pole
4. Onsite electrical wiring
4.1 AC and DC power isolation
4.2 Earthing the unit
4.3 Wiring AC power to the SECTOR II Trac Barrier
4.4 Installing loop detectors
4.4.1 Installing a single FLUX SA loop detector
4.4.2 Installing dual FLUX SA loop detectors
5. Basic controller setup
5.1 Powering up the SECTOR II
5.2 Programming the controller
6. Installation handover
7. Advanced controller setup
7.1 Menu navigation map
Installation ow diagram: Center-fold pull-out
8. Maintenance
8.1 How and when to do maintenance
8.2 Site related issues
page 7
page 8
page 8
page 9
page 9
page 10
page 11
page 11
page 12
page 13
page 14
page 17
page 18
page 18
page 18
page 19
page 19
page 21
page 23
page 23
page 23
page 27
page 29
page 30
page 39
page 47
page 47
page 49
page 5
Contents