2
TABLE OF CONTENTS
1.0 DESCRIPTION 3
1.1 General Information 3
1.2 Principals of Operation 4
1.3 General Specifications and Sizing Guidelines 4
2.0 INSTALLATION 20
2.1 Unpacking 20
2.2 Storage 20
2.3 Safety Considerations 20
2.4 Plan Ahead 23
2.5 Power Supply Installation 23
2.6 UV Chamber Installation 23
2.7 Quartz Sleeve Installation 24
2.8 Lamp Installation 25
2.9 Plumbing the UV Chamber 25
2.10 Plumbing the Strainer 26
2.11 Plumbing the Pressure Switch 26
2.12 Plumbing the Air Bleed for Vertical Mount Chambers 28
2.13 System Wiring 29
2.14 Safety Cover Wiring 29
2.15 UV Sensor Installation 29
2.16 Bonding the System 29
3.0 OPERATION 30
3.1 Start-up Procedures 30
3.2 UV Meter Operation 30
4.0 MAINTENANCE 30
4.1 Routine Maintenance 30
4.2 Recommended Broken Lamp Handling Practices 34
5.0 WARRANTY INFORMATION 34
5.1 How to Obtain Help 34
5.2 Returning a ChlorKing® - Sentry UV Product 34
5.3 Activating/Validating Warranty and Making a Warranty Claim 35
5.4 Warranties for Housing, Parts, Lamps, and Ballasts 35
5.5 Warranty for Quartz Sleeves 36
5.6 General Conditions and Limitations 36
Note: This manual is subject to change at any time based on system improvements, design
changes, authorized modifications or new information. Please consult ChlorKing-Sentry UV
for the latest revision.
Manufacturer:
ChlorKing-Sentry UV
2935 Northeast Parkway
Atlanta, GA 30360
1-800-536-8180