4-18
Cisco 6160 Hardware Installation Guide
OL-2190-02 B0
Chapter 4 Installing a Cisco 6160 Without a POTS Splitter Configuration
Installation Procedures
Figure 4-10 shows the cabling for a DS3 subtended network configuration.
Figure 4-10 Cabling for DS3 Subtended Network Configuration
Step 3 On the first subtended node chassis backplane, attach the end of the coaxial cable used in Step 2 to the
RX BNC for DS3 Port 1 on the I/O card.
Step 4 On the subtending host chassis backplane, attach one end of a coaxial cable to the RX BNC connector
for DS3 Port 2 on the I/O card.
Step 5 On the first subtended node chassis backplane, attach the end of the coaxial cable used in Step 4 to the
TX BNC connector for DS3 Port 1 on the I/O card.
Step 6 On the subtending host chassis backplane, attach one end of a coaxial cable to the TX BNC connector
for DS3 Port 3 on the I/O card.
Step 7 On the first subtended node chassis backplane, attach the end of the coaxial cable used in Step 6 to the
RX BNC for DS3 Port 1 on the I/O card.
Step 8 On the subtending host chassis backplane, attach one end of a coaxial cable to the RX BNC connector
for DS3 Port 3 on the I/O card.
TX
RX
TX
RX
TX
RX
PORT 1
PORT 2
PORT 3
60V,1A MAX
P1
P5
P4
P3
P2
TX
RX
TX
RX
TX
RX
PORT 1
PORT 2
PORT 3
60V,1A MAX
P1
P5
P4
P3
P2
TX
RX
TX
RX
TX
RX
PORT 1
PORT 2
PORT 3
60V,1A MAX
P1
P5
P4
P3
P2
Receive
Transmit
Receive
Transmit
Receive
Transmit
Receive
Transmit
54016
Network
1st subtended
node chassis
Subtending
host chassis
2nd subtended
node chassis