21
Introduction
This chapter describes the behavior of the front panel indicators when
the residential gateway is first powered up, during normal operations,
and in special conditions.
Operation of Front Panel
Indicators
In This Chapter
Initial Power On, Calibration, and Registration (AC Power
applied) ...............................................................................................22
Normal Operations (AC Power Applied) ........................................23
Special Conditions ..............................................................................25