EasyManua.ls Logo

Cisco Nexus 3064 User Manual

Cisco Nexus 3064
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Cisco Nexus 3000 Series Hardware Installation Guide
First Published: 2014-04-30
Last Modified: 2018-11-01
Americas Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 527-0883

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Cisco Nexus 3064 and is the answer not in the manual?

Cisco Nexus 3064 Specifications

General IconGeneral
Product ModelNexus 3064
CategorySwitch
Switching Capacity1.28 Tbps
Form Factor1 RU
MAC Address Table Size32, 000 entries
Jumbo Frame SupportYes
Jumbo Frame Size9216 bytes
Operating SystemCisco NX-OS
Memory4 GB
VLANs4096
AC Input Voltage100 to 240 VAC
AC Input Frequency50 to 60 Hz
Operating Temperature32°F to 104°F (0°C to 40°C)
Storage Temperature-40°F to 158°F (-40°C to 70°C)
Ports48 x 10GE SFP+
AirflowPort-side exhaust or port-side intake
Humidity5% to 95% (non-condensing)
Power SupplyDual hot-swappable power supplies

Summary

Preparing the Site

Installing the Chassis

Safety

Provides critical safety information and warnings for installing Cisco Nexus switches.

Installation Options with Rack-Mount Kits, Racks, and Cabinets

Explains various rack-mount kit options and rack types for installing Cisco Nexus switches.

Preparing to Install the Chassis

Lists prerequisites and site requirements before installing the Cisco Nexus switch chassis.

Unpacking and Inspecting the Chassis

Details the steps for safely unpacking and inspecting the Cisco Nexus switch chassis for damage.

Installing a 1 (RU) Chassis in a Four-Post Rack

Guides the installation of a 1 RU Cisco Nexus switch into a four-post rack using specific kits.

Installing a 1 (RU) Chassis in a Two-Post Rack

Details the process of installing a 1 RU Cisco Nexus switch into a two-post rack.

Installing a 2 (RU) Chassis in a Four-Post Rack

Guides the installation of a 2 RU Cisco Nexus switch into a four-post rack.

Installing a 2 (RU) Chassis in a Two-Post Rack

Details the installation of a 2 RU Cisco Nexus switch into a two-post rack using center-mount brackets.

Grounding the Chassis

Explains the procedures for properly grounding the Cisco Nexus switch chassis for safety.

Starting the Switch

Provides instructions on how to power up and verify the initial status of the Cisco Nexus switch.

Connecting the Switch to the Network

Preparing for Network Connections

Discusses site preparation and equipment gathering for establishing network connections to the switch.

Connecting to a Console

Guides on connecting to the switch's console port for initial configuration and management.

Connecting the Management Interface

Explains how to connect to the switch's management interface for initial IP configuration.

Replacing Modules

Replacing an AC Power Supply

Guides on how to replace an AC power supply module in the Cisco Nexus switch.

Replacing a DC Power Supply

Details the procedure for replacing a DC power supply module in the Cisco Nexus switch.