EasyManua.ls Logo

Clearlight CE-2 - Page 9

Clearlight CE-2
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8) Make sure each of the lead wires on the top of the left, right, back and front panels is
protruding through the top panel; then plug each of the four lead wires into the four connectors
of the top panel as in the photo below
9) Remove the screws used to lock the AM/FM/CD player before using.
10) Congratulation! You have finished the installation of your new Clearlight Infrared
Sauna.
8

Related product manuals