EU +44 118 324 1242 | Germany +49 361 7473 4613
www.clearlight-saunas.eu
13
PREMIER IS-1, IS-2 AND IS-3
Assembly Instructions Cont’d
1. Lower the roof panel on to the assembled panels.
2. Position the top panel so that the exterior lights are at the front of the sauna.
3. Make sure that the cables from the top panel do not get pinched when placing the panel.
4. Gently place the top panel onto the rest of the assembled panels. When all four corners are in place, gently
push down the roof panel from the outside corners until it ts snugly over the rest of the panels.
9 - INSTALLING THE ROOF PANEL
(7)