8
3 - POSITIONING
3.1 PRELIMINARY INFORMATION
3.2 FUNCTIONAL SPACES
3.3 POSITIONING
Units are designed to be installed:
INTERNAL
in fixed positions.
Limit vibration transmission:
use antivibration devices on unit bearing/supporting
points;
install flexible joints on the hydraulic.
Installation standards:
Safe accessible position;
avoid flood-prone places;
verify unit weight and bearing point capacity;
verify that all bearing points are aligned and leveled;
Operate in compliance with safety regulations in force.
For detailed information (dimensions, weight, technical
characteristics etc.) please refer to the TECHNICAL
INFORMATION section.
Use single protection devices : gloves, glasses ecc.
During positioning consider these elements :
technical spaces required for the machine and system
place where the machine will be installed
electrical connections
water connections
air / aeraulic ducts
Do not considerer these elements could decrease
performances and operational life of the unit.
Functional spaces are designed to:
guarantee good unit operation
Carry out maintenance operations
protect authorized operators and exposed people
Respect all functional spaces indicated in the TECHNICAL
INFORMATION section.
Double all functional spaces if two or more unit are aligned.