12 WSHN-XEE2 10.2-120.2
4.9 Operation sequence
Close all vent valves in the high points of the unit hydraulic circuit
Close all drain valves in the low points of the unit hydraulic circuit:
•
Heat exchangers
•
Pumps
•
collectors
•
storage tank
•
free-cooling coil
1. Carefully wash the system with clean water: fill and d ain the system several times.
2. Apply additives to prevent corrosion, fouling, formation of mud and algae.
3. Fill the plant
4. Execute leakage test.
5. Isolate the pipes to avoid heat dispersions and formation of condensate.
6. Leave various point of service free (wells, vent-holes etc).
Neglecting the washing will lead to several fil er cleaning interventions and at worst cases can cause damages to the exchangers and the
other parts.
4.10 hydronic assembly
For details see:
9 Accessoriesp.41
4.11 VALVE FOR DOMESTIC HOT WATER
For details see:
9 Accessoriesp.41
4.12 NATURAL COOLING function
For details see:
9.6 NATURAL COOLING functionp.46