EasyManua.ls Logo

Cobra CPI 480 - Inverter Performance Testing Steps

Cobra CPI 480
23 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
Quick Evaluation
Before Installation
Introduction
A test load that can
be plugged into the AC
receptacle on the inverter
for short term testing at
a low power level.
To check your inverter’s performance before installation:
1. Turn the inverter off (see page 11
for details). If the power source is
a DC power supply, switch it off
as well.
2. Connect cables to power
input terminals (see page 6
for details).
3. Connect cable to power source
(see page 8 for details).
4. Check to make sure all
connections are secure.
5. Turn the inverter on. If the
power source is a DC power
supply, switch it on first.
6. Plug in the test load.
The inverter should supply power
to the load. If the inverter is not
working properly, refer to the
troubleshooting guide on page 14
or power and protection indicators
section on page 12.
On/Off Switch to Off
Connect T erminals
Connect Po wer Source
On/Off Switch to On
Connect Test Load
T est Load
USB Connection

Related product manuals