EasyManua.ls Logo

Coca-Cola Post Mix System - Items You will Need to Complete the Restart Process; Check and Turn on the CO₂ Supply; Turn on the Mains Water Supply

Coca-Cola Post Mix System
19 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Coca-Cola Work Out Kit
Small brush
Paper towels
Pair of Scissors
Clean cloths
CObottle
Measuring Jug and Bucket
New Bag in Box (if required)
Personal Protective
Equipment
Items you will need to complete
the restart process.
Check and turn on
the COsupply
Turn on the mains
water supply
Turn on the CO
Check gauge goes to approx. 600psi
Locate the mains water supply valve
Turn it to the on position
1
2
3
Turn on isolator valves (straight down)
Only turn on valves that have a grey pipe
connected to them