• Coca-Cola Work Out Kit
• Small brush
• Paper towels
• Pair of Scissors
• Clean cloths
• CO₂ bottle
• Measuring Jug and Bucket
• New Bag in Box (if required)
• Personal Protective
Equipment
Items you will need to complete
the restart process.
Check and turn on
the CO₂ supply
Turn on the mains
water supply
Turn on the CO₂
Check gauge goes to approx. 600psi
Locate the mains water supply valve
Turn it to the on position
1
2
3
Turn on isolator valves (straight down)
Only turn on valves that have a grey pipe
connected to them