EasyManua.ls Logo

Coca-Cola Post Mix System - User Manual

Coca-Cola Post Mix System
19 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Classification - Internal
Maintaining or Shutting Down Your
Post Mix System
Question and Answer IconNeed help?

Do you have a question about the Coca-Cola Post Mix System and is the answer not in the manual?

Coca-Cola Post Mix System Specifications

General IconGeneral
BrandCoca-Cola
ModelPost Mix System
CategoryBeverage Dispenser
LanguageEnglish

Summary

Maintaining Your Post Mix System

Back End - Cellar Equipment

Procedures for maintaining cellar equipment, including water, electrical, and CO2 supply.

Front End - Tower or Heads

Procedures for maintaining front-end dispensing equipment, ensuring proper connections and stability.

Shutdown

Steps for routine shutdown of the post-mix system, involving cleaning and turning off CO2.

Shutting Down Your Post Mix System

Back End - Cellar Equipment Shutdown

Steps for shutting down cellar equipment, including turning off electrical, CO2, and water supplies.

Front End - Tower or Head Shutdown

Steps for shutting down front-end dispensing equipment, focusing on cleaning and valve procedures.

Restarting Your Post Mix System

Restart Preparation and Initial Steps

Items needed, CO2 supply check, and turning on the mains water supply.

Core System Restart Procedures

Resetting the cooler/carbonator, cleaning Bag in Box connectors, and replenishing carbonated water.

Syrup Replenishment

Procedures for replenishing in-date and out-of-date syrups in the system.

Dispense Head Cleaning

Cleaning dispense heads, nozzles, diffusers, and associated components.

Final Quality Checks

Performing final checks for taste, carbonation, and temperature of the dispensed product.